How much time should you allow for your office relocation?
Allow for the whole relocation, the move window and the first working period after it. A prepared small office may move in an evening or over a weekend, but fit-out, access, parking and IT can stretch the wider office move timeline into weeks or months.
In plain terms, the van part is only the middle of the job. Your real business question is how much working time you lose because a quick unload still leaves a problem if computers, phones and desks are not ready.
Most delays come from decisions made too late. Access has to be agreed with building management, crates need labels that match the new floor plan, and IT equipment needs a clear plan before the removal team arrives.
Our advice is to judge timing in three parts: how long the move takes to plan, how long the physical office move takes, and when your team can work again afterwards.

The physical move is only one part of the timeline
A broad answer to how long an office move takes is only useful when the timeline is split properly. The physical move can be short when planning, access and IT are ready in advance, not when those decisions are left for the removal day.
A managed office fit-out can take 1 to 3 months or more, a conventional lease fit-out can take 4 to 16 weeks, and the move stage can take 1 to 4 weeks, with some moves completed over a weekend, according to Knight Frank. Those figures show why office relocation time and move day time should be treated separately.
The three parts sit in a clear order, and each one covers different work.
| Timeline part | What it covers |
|---|---|
| Full relocation | Lease, fit-out, access, IT, staff planning, packing and move scheduling |
| Physical move | Loading, transport, unloading, furniture placement and basic set-up |
| Usable office | Workstations, internet, phones, labels, crates and staff access ready to work |
For a London office, the full timeline also includes building access, parking rules and the times when vans can load safely. A good office move timeline gives each part enough room, so the actual move window is not carrying work that should already be done.
We move evenings and weekends at no extra charge, so your team does not lose a working day.
Request a QuoteReadiness changes the move day length
Put two offices with the same desk count side by side. One has packed crates, labelled monitors, booked lift access and a clear desk plan; the other still has staff deciding what goes where. The first move is a removal job. The second becomes a decision-making session with a van waiting outside.
Desk count still matters. More desks mean more chairs, monitors, filing cabinets and meeting room furniture. Even so, office move preparation often decides whether the team can keep loading or has to stop for missing labels, locked rooms or furniture that no one planned to dismantle.
Small office timing
A smaller office is the strongest candidate for a short move window when the preparation is tight. If crates are packed, labels match the new floor plan and building access is open at the agreed time, the physical office move can often be planned around an evening, a day or a move weekend.
Knowing how long to move a small office comes down to what is being moved and what needs setting up again. Ten desks with loose monitors are one job. The same number of desks with heavy storage, meeting room tables and IT kit that needs careful reconnection is a different timing discussion.
Larger office timing
Bigger offices need tighter coordination because more people are affected by every delay. Phased moves can keep part of the business working while another area is moved, but phasing also needs clear labels and a floor plan that everyone follows.
We plan office removals timing around desk count, IT needs, floors and access, because those details decide the crew, van space and move window. A larger move works best when the plan leaves no room for guessing on the day.

Order staff access cards and fobs for the new building as soon as the move date is fixed. Desks, phones and internet can all be working and people still cannot get through the front door on the first morning.
A simple sequence keeps the van part short
The quickest physical moves are prepared before the removal team reaches the loading bay. Office move planning should start once the date and new address are firm enough to discuss access, IT and packing properly.
At GT Removals, we use the move date, addresses, item list, access details and IT needs to recommend the right plan.
- Confirm the move date, both addresses and the preferred move window.
- Check building access, lifts, loading bays and security rules.
- Confirm IT, phones and internet plans early.
- Share an item list, photos and any furniture dismantling needs.
- Arrange crates, labels and the new floor plan.
- Tell staff what to pack and what to leave for the removals team.
That order keeps the office removal quote grounded in the real job. Photos can show furniture that needs dismantling, and access details can show whether a Luton van is practical for the street or loading bay.
Crates and labels deserve more attention than they usually get. A label should tell the mover where an item goes at the new office, and the floor plan should match those labels. Without that link, unloading slows down just when you want the team setting up work areas.

Access rules can stretch a quick job
When the van cannot load close to the building, a quick office move becomes slower. London office removals timing is shaped by goods lifts, loading bays, security desks and the rules set by building management.
Central London adds another timing layer. If a move enters the Congestion Charge zone during charging times, the charge may apply and should be agreed before the move. Parking suspensions also vary by borough, with their own notice periods and costs, so a Westminster move and a Wandsworth move should not be planned from the same parking assumption.
Managed buildings can be very organised, but they still need notice. A lift slot, loading bay time and security access can decide whether the team starts loading straight away or waits with equipment in reception.
Before confirming the final move window, we always want access checked against the building rules and the street outside.
Photograph the back of every docking station, monitor stand and desk phone before anything is unplugged. Reconnection is far quicker when someone can see how it looked before.
Usable desks mark the real finish
Crates can be in the right room, chairs can be under desks and the van can be gone. If staff arrive and cannot connect to the internet, find their monitors or use phones, the business has not really got its working office back. An office move is finished when people can work at their desks again, not when the last crate has been unloaded.
IT disconnection and reconnection need a place in the move plan. Computers, monitors, phones and network equipment should be handled in a way that matches the new desk layout, especially where teams need to start work at a set time after the move.
Business internet can also affect the office move set-up. BT Business gives fibre installation timings of 1 to 3 working days where the right unit is already in place, 9 to 18 working days for a one-stage engineer install, and variable timing where external work is needed. That is enough reason to check connectivity well before the physical move week.
At GT Removals, we can include IT disconnection and reconnection in the office move plan where needed. We still look at the practical basics first: where each workstation goes, which kit belongs with it, and whether staff can use the space at the first working period after the move.
The sharper measure is usable working time after the move, because that is where a badly timed move shows up in lost hours rather than in the removals bill.

We handle the full office move in house, from desks to IT setup, with public liability cover on every job.
Speak to Our TeamQuestions we get asked about office move timing
Do you need someone from your business at both offices during the move?
Yes, having someone available at each end makes decisions faster if access, keys or room allocation need checking. That person does not need to move furniture, but they should be able to confirm where things go.
Should staff move their own laptops?
Many offices ask staff to take laptops and small personal items themselves, especially if they need them straight away. Whatever you choose, keep it consistent so the removals team knows exactly what is included.
Can old office furniture be cleared during the same relocation?
Unwanted furniture can be planned as a separate clearance part of the move when it is agreed in advance. Mixing clearance with live office items without clear labels slows the move and increases confusion.
Can storage help if lease dates do not line up?
Storage can bridge a gap between leaving one office and entering the next. It works best when storage items are separated from items needed for the first working day.
How far in advance should you start planning an office move?
One widely used relocation timeline suggests building the plan around six months out, gathering office removals quotes at about four months, arranging building access at around two months, getting crates and labels roughly three weeks ahead, and asking staff to pack personal desk items in the final week. Treat those as planning examples rather than fixed rules, because a small prepared office and a large phased one sit at very different ends of that range.